Project overview
Construction site: New Delhi, India
Construction area: 10000m2 * 2 floors * 3 buildings
Contracting scope:
1、 Decoration works of SMT 10000 dust-free workshop on the first floor of F3, decoration works of assembly workshop on the first and second floors of F1 / F2 and F3 (including color steel plate partition wall, color steel plate ceiling and anti-static PVC floor);
2、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), HVAC works of SMT 10000 dust-free workshop on the second, third and fourth floor of Building 1 and F3 first floor (MAU + FFU + DDC system)
3、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), one building second, third and fourth floor, F3 first floor SMT 10000 dust-free workshop air compression pipeline project
4、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), 234Th floor of Building 1, and anti-static grounding works of SMT 10000 dust-free workshop on F3 first floor
5、 F1 / F2 first and second floor, F3 second floor assembly workshop (AHU air conditioning system), 234Th floor of Building 1, SMT 10000 dust-free workshop on F3 first floor, workshop lighting power distribution and air conditioning power distribution works
Tel: 400-7885-205
Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd On record
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd