Hello! WelcomeDongguan Haicheng Yonghe air conditioning purification technology Co., LtdOfficial website!
Current location:Home>>Domestic cases>>Lixun precision

Lixun precision building 13 electromechanical HVAC project (Gaowei optical Guangda Industrial Park)

Published on:2022-04-15 16:23:19  

Lixun precision building 13 electromechanical HVAC project (Gaowei optical Guangda Industrial Park)

Product details

Project overview

Construction site: Dongguan Liaobu GAODA Industrial Park

Construction area: 3000㎡ * 3 floors

Contracting scope:

1、 1F 1000, 2f 10 and 4f 10000 dust-free workshop decoration works (including color steel plate partition wall and brick partition wall; color steel plate ceiling, gypsum board ceiling, aluminum gusset plate ceiling, anti-static PVC floor, environmental self flow floor, elevated floor, etc.);

2、 HVAC works of 1 / 2 / 4f constant temperature, humidity and dust-free workshop (MAU + FFU + DDC system)

3、 1 / 2 / 4f air compression pipeline works

4、 1 / 2 / 3 nitrogen pipeline works

5、 Anti static grounding works 4f / 2

6、 1 / 2 / 4f process production power distribution, lighting power distribution and air conditioning power distribution works

7、 Roof 1000rt air conditioning main engine room project


Contact US

Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd

Tel: 400-7885-205

Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province 

Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd      On record       

Copyright© 2021  Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd

On record