Project overview
Construction site: Dongguan Liaobu GAODA Industrial Park
Construction area: 3000㎡ * 3 floors
Contracting scope:
1、 1F 1000, 2f 10 and 4f 10000 dust-free workshop decoration works (including color steel plate partition wall and brick partition wall; color steel plate ceiling, gypsum board ceiling, aluminum gusset plate ceiling, anti-static PVC floor, environmental self flow floor, elevated floor, etc.);
2、 HVAC works of 1 / 2 / 4f constant temperature, humidity and dust-free workshop (MAU + FFU + DDC system)
3、 1 / 2 / 4f air compression pipeline works
4、 1 / 2 / 3 nitrogen pipeline works
5、 Anti static grounding works 4f / 2
6、 1 / 2 / 4f process production power distribution, lighting power distribution and air conditioning power distribution works
7、 Roof 1000rt air conditioning main engine room project
Tel: 400-7885-205
Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd On record
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd