Project overview
Construction site: Lahore, Pakistan
Construction area: 9000㎡
Contracting scope:
1、 Workshop decoration works (including color steel plate partition wall and brick partition wall; color steel plate ceiling, gypsum board ceiling, aluminum gusset plate ceiling, anti-static PVC floor, environmental self leveling floor, etc.);
2、 HVAC project of constant temperature, humidity and dust-free workshop
3、 Air compression pipeline engineering
4、 Anti static grounding works
5、 Process production power distribution, lighting power distribution and air conditioning power distribution works
6、 Machine room project of 14 130kW air cooling module units
Tel: 400-7885-205
Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd On record
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd