Project overview
Construction site: Bugao Avenue, Chang'an, Dongguan
Construction area: 5500m2 * 3 floors
Contracting scope:
1、 1 / 2 / 3F plant decoration works (including color steel plate partition wall, brick partition wall and explosion-proof wall masonry; color steel plate ceiling, gypsum board ceiling, aluminum gusset plate ceiling, anti-static PVC floor, environmental self flow floor, etc.);
2、 HVAC project of 1F 10000 class constant temperature and humidity dust-free workshop (MAU + FFU + DDC system) Electromechanical HVAC engineering of 2 / 3F ordinary constant temperature and humidity workshop
3、 1 / 2 / 3F air compression pipeline works
4、 1 / 2 / 3F water supply and drainage works
5、 1 / 2 / 3F lightning protection and grounding works
6、 1 / 2 / 3F smoke control and exhaust works
7、 1 / 2 / 3F process production power distribution, lighting power distribution and air conditioning power distribution works
8、 2000rt air conditioning main engine room project
Tel: 400-7885-205
Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd On record
Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd