Hello! WelcomeDongguan Haicheng Yonghe air conditioning purification technology Co., LtdOfficial website!
Current location:Home>>Domestic cases>>VIVO

Vivo EU factory electromechanical HVAC decoration project

Published on:2022-05-05 00:00:00  

Vivo EU factory electromechanical HVAC decoration project

Product details

Project overview

Construction site: Bugao Avenue, Chang'an, Dongguan

Construction area: 5500m2 * 3 floors

Contracting scope:

1、 1 / 2 / 3F plant decoration works (including color steel plate partition wall, brick partition wall and explosion-proof wall masonry; color steel plate ceiling, gypsum board ceiling, aluminum gusset plate ceiling, anti-static PVC floor, environmental self flow floor, etc.);

2、 HVAC project of 1F 10000 class constant temperature and humidity dust-free workshop (MAU + FFU + DDC system) Electromechanical HVAC engineering of 2 / 3F ordinary constant temperature and humidity workshop

3、 1 / 2 / 3F air compression pipeline works

4、 1 / 2 / 3F water supply and drainage works

5、 1 / 2 / 3F lightning protection and grounding works

6、 1 / 2 / 3F smoke control and exhaust works

7、 1 / 2 / 3F process production power distribution, lighting power distribution and air conditioning power distribution works

8、 2000rt air conditioning main engine room project


Contact US

Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd

Tel: 400-7885-205

Add: Room 201, No. 9, Zhenlong Road, Chang'an Town, Dongguan City, Guangdong Province 

Copyright© 2021 Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd      On record       

Copyright© 2021  Dongguan Haicheng Yonghe air conditioning purification technology Co., Ltd

On record